Please colleagues I need to choice a proper hopper shape for a Fertilizer bulk blender flowing throut a high humidity raw material like zeolite, so we are in doubt whether use squard or rectangular hopper shape to avoid the so call voul effect that can create obstruction
No Answer is Posted For this Question
Be the First to Post Answer
what is petrol density ? why ?
ENGINEERING MATERIAL - EXAMPLE 12.2 : At 150 degree Celsius, a mixture of 40 wt % Sn and 60 wt % Pb present, forming phases of alpha and beta. Chemical composition of Sn at each phase : CO (overall) : 40 %, CA (alpha) : 11 %, CB (beta) : 99 %. (a) State 2 reasons for the existences of alpha and beta phases for the mixture of Sn - Pb at 150 degree Celsius. (b) By using Lever Rule, calculate the weight fraction of each phase for alpha, WA = Q / (P + Q) and beta, WB = P / (P + Q) where Q = CB - CO and P = CO - CA.
wha is Adsorption column chromatography?
What is the process of including heat exchangers in ammonia refrigeration system?
Thyristor related applications
What is screen analysis?
What is the method of determining maximum differential pressure during hydro testing of shell and tube heat exchangers?
Explain how can you determine the proper pipe thickness for a slurry line?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.33 : An engineering corporation that produces a type of healthy food has A number of shares of $B preferred stock and C number of shares of $H common stock outstanding. In a typical financial year, let the net income obtained = D. The amount retained by the corporation = E. (a) Calculate the amount of money distributed to the shareholders if : (i) D > E; (ii) D = E; (iii) D < E. (b) Let preferred dividend = F, common dividend = G, CH > G. Find the values of F and G, in term of A, B, D and / or E when : (i) (D - E) > AB; (ii) (D - E) < AB; (iii) (D - E) = AB.
Explain some of the consequences of an undersized kettle type reboiler?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.26 : In a construction accounting for a biochemical processing plant, $A has been spent to date, and another $B is expected required to complete the construction project. The biochemical processing plant is expected to generate a total revenue of $C. Calculate the : (a) estimated total costs; (b) percentage completion of project; (c) total estimated profit; (d) profit to date.
How to calculate the quantity of steam lost due to pinhole leak in a steam line of known pressure and line size?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)