Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


A electrical meter has load 500 kw. In 2 hr what rading will come on meter.

Answers were Sorted based on User's Feedback



A electrical meter has load 500 kw. In 2 hr what rading will come on meter...

Answer / rishiraj

500KW/hr = 500 units
500KW/2hr = 1000 units
So after 2 hrs meter will show addition of 1000 units in meter reading.
E.g.: Before operation of 2 hrs meter reading is 5000, then meter reading will be 6000 after operation of 2 hrs.

Is This Answer Correct ?    4 Yes 0 No

A electrical meter has load 500 kw. In 2 hr what rading will come on meter...

Answer / pradeep kumar satapathi

If load is constant for two hours then the total consumption or generation will 500+500 i.e. 1 MW ONLY.

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

how to measure dc earth leakage current?

0 Answers  


why can not run two different phase circuit in to the same conduite

1 Answers  


Alternator rotor earth fault relay circuit

0 Answers  


what difference between thermal and bi-metal over load relay?

2 Answers  


If OLTC is in manual position there is chance to variation of voltage(Low or High)?

1 Answers   Juniper Networks,


hi engineers,if suppose distribution is going to two diff village mistakenly they r interchange the neutral of twowhat happen?

7 Answers   Bhel, L&T,


why current coil has less number of turns compared to pressure coil?

8 Answers   Airtel,


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

0 Answers  


Graphs of measuring power and speed on dc motor

0 Answers  


what do you know about electrical

15 Answers  


Is there any particular formula for sizing the bus bar based on the current rating

1 Answers   Bunt Solar,


the site measured knee point voltage of protection class CTs should be greater than rated knee point voltage? what about meetering class CTs. Should it be below the rated knee point voltage?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)