Answer / Sushmita Kesari

A Lost Time Accident (LTA) is an incident in the workplace that results in injury or illness, causing the injured employee to lose time from work. It should be reported within 48 hours to government authorities because timely reporting allows for proper investigation and implementation of corrective measures to prevent future incidents.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Engineering AllOther Interview Questions

I am selected interview for computer sc.please give me some information how many types question asked in interview.my id is sumanadas10@gmail.com

1 Answers  


Write a program in ā€˜C’ language that will perform the following operation on static stack. 1. push 2. pop 3. Display 4. Exit Create separate functions for each operation. The push() should accept one argument of structure type and will not return any thing. The pop() function will not receive any argument & return structure type value. The stack & top must be declare as external variable. Each element of stack will contain the following information Roll No, Std Name, Course. Use do-while loop & switch case for generating the above menu. The format of the output should is given below: S.No. Roll No. Student Name Course 1 cse01 Anil Singh B.Tech

1 Answers  


1) There is a circular pizza with negligible thickness that is cut into 'x' pieces by 4 straight line cuts. What is the maximum and minimum value of 'x' respectively 2)A ship leaves on a long voyage. When it is 18 miles from the shore, a seaplane, whose speed is 10 times that of the ship is sent to deliver mail. How far from the shore does the seaplane catch upon with the ship? 3) If the distance traveled (s) in time (t) by a particle is given by the formula s = 1+ 2t+3t2+4t3, then what is the distance traveled in the 4th second of its motion? 4)3 men finish painting a wall in 8 days. Four boys do the same job in 7 days. In how many days will 2 men and 2 boys working together paint two such walls of the same size?

1 Answers   TCS,


What is my favorite sport?

1 Answers   NetTantra Technologies,


What is the definition of gain?

2 Answers  


i want a program in c# for 100 or for a number greater than 100.....pls help

1 Answers  


is the used fire extinguisher fall under Hazardous waste material?

1 Answers  


What is the allowable load carrying capacity of a circular column section of 400 mm diameter reinforced with 6x25 mm diameter bars adequately tied with spirals? Consider concrete of grade M25 and steel of grade Fe 415.

1 Answers  


I am from B.Tech back ground, i had Applied to do masters in Engineering management, and university gave Admission and sent I-20, if the interviewer asks why are doing masters in this field, even you are from B.Tech (information technology)? Can any one give me relevant answer, if interviewer asks that question

1 Answers   US Consulate,


Write a program in ā€˜C’ that will accept 10 numbers from the user, sort them & then perform the binary search. The searching number will be arithmetic mean of the 10 numbers accepted from the user. Write the sort() & binSearch() functions for performing the sorting & binary search. Also create display function() for displaying the list. Sort() function will use selection sort and only receive one argument (Single char type)as type of sorting i.e. ascending (a) or descending (d). Display the list after sorting using a display() function. binSearch() function will accept one argument as a number to be search & return null or the index position of that number in the array. display() function is non argument non return type function. It will simply display the list row-wise. Program should use these functions by displaying the appropriate message for found or not found.

1 Answers  


A man, a woman, and a child can do a piece of work in 6 days. Man only can do it in 24 days. Woman can do it in 16 days and in how many days child can do the same work? (WITH EXPLANATION)

2 Answers   TCS,


Prove that in a self-complementing code the sum of the weights must be 9?

8 Answers   IIIT, Mind Tree, TCS,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)