Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the difference between "ampere trip and ampere frame"



what is the difference between "ampere trip and ampere frame"..

Answer / 7anoter4

Ampere Frame [AF] it is the rating breaker current [maximum
current which the breaker will withstand for a long
time].Ampere trip [AT] it is the current set to trip the
circuit [usually from 60% up to 100% of the AF].

Is This Answer Correct ?    41 Yes 7 No

Post New Answer

More Electrical Engineering Interview Questions

WHAT IS THE USE OF TERTIARY WINDING IN A STAR/DELTA TRANSFORMER ?

3 Answers  


What is the procedure/activities to be taken to inject the current more than 2000A by using 2000A Loading Transformer?

0 Answers  


what are the energy savings methods that are existing in coal based power plant?

1 Answers  


Here iam a question with SYNCHRONIZATION PANNEL related issue, as i want to design a SYNC.pannel board iam giving the 2 nos of 1MVA Generators to sync pannel , then what wil be the out put of the sync pannel, whether it wil be one cable coems from the sync panel or two cables.. as iam using two transformers to meet my load demand, so pls clear me whether two cables comes from sync panel to connect to transformers or only one cable

3 Answers  


In power transformer YnD0 Vector Group is possible or not? if possible, what will be the vector diagram and what are the conditions?

2 Answers  


IN A HT CABLES i.e. 1.9/3/3 kv, what is the meaning of 1.9 and 3.3.

1 Answers  


wats the procedure to calculate no of batteries for ups?

1 Answers  


what is the pre commissioning test to be carried out on LT power panel at site?

1 Answers  


what is cogging and crawling

2 Answers  


l&t switch FN 63 handle position can we change

0 Answers   OPTCL,


what is necessity of using isolation transformer?

4 Answers   NTPC,


What difference between MCB,MCCB,RCCB,ELCB please explain briefly with its rating.

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)