Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


when we switch on the switch and load is not connected at home,is electricity wasted?



when we switch on the switch and load is not connected at home,is electricity wasted?..

Answer / uzair bin khalid

when we switch on the switch and load is not connected at
home, no is electricity wasted bcz loop is not completed.

Is This Answer Correct ?    8 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

In a HT switchboard where Nos. of Transformers are connected, how to decide Incoming cable size? Whether Cable should be rated for connected load or maximum demand?

1 Answers   Power Grid,


Can we step up a 230V supply to 400V using a single phase transformer??

2 Answers  


what is voltage

7 Answers   TCS,


hi friends this is a newcomer in your community of enthusiastic peoples. i am preparing for SSC (CPWD JUNIOE ENGG EXAM FOR ELECTRICAL) pls guide me on the same how to crack it? PLS LET ME KNOW IS ANYONE THERE WHO PASED IT? CAN I GET THE QUESTION PAPERS OF PREVIOUS EXAMINATIONS?

0 Answers  


What do you mean by cogeneration? What its working principle?

0 Answers  


what happens in the short circuited secondary transformer,if the resistance of the short circuit is increased gradually?

0 Answers   IIT,


Why transformer is rated in kva?

4 Answers   L&T, NDPC,


why PD testing for power cables

1 Answers   Bhushan Power Steel, CSE, Datre Corporation,


We use ungrounded DC system (220V/110V) for control and protection system in substations etc. Suppose we have long 2 core DC cables running from our DCDB in control room to the load (length of around 2 to 3 km). Do we need to protect these long DC cables from earth leakages or not? If yes how?

5 Answers   Siemens,


how the calculation is done if the DG set require for the -- -48 to -51v 4000 ah battery set .

1 Answers   BSNL,


why we do occ & scc test in transformer ?how we can do it ?

2 Answers  


why insulation cost is more in underground cable than in overhead line?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)