Answer / mehul kothari
Lap should be staggered min 1m
But if it is not possible on site condition or you are not able to stood column vertically lap can be provided in between h/4 from top and bottom
If i use easy word to explain you can leave staggerd in middle of column
H/4 should be calculated as clear hight of column
Means h= heiht of slab - thickness of slab - depth of beam
| Is This Answer Correct ? | 0 Yes | 0 No |
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
Please tell me the difference between nominal and clear cover. Thanks.
How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3
residential projects,structural.
0 Answers Ambuja, KBR, Saudi Aramco Shell Refinery Company SASREF,
how can we calculate the quantity of cement, sand, aggregate in any concrete mix
how many cubic feet in one unit of sand?
16 Answers L&T, PSPCL, Ratna Infrastructure Projects,
WHAT IS THE %WASTAGES OF CEMENT, BRICK,TILES, STEEL,IN 1 M3,10M2,1 TON RESPECTIVELY
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
RR masonry rate analysis
what are the Task work of different labour.?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)