Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why we have use 3 & 1/2 core cable use for general electrical supply arrangement



Why we have use 3 & 1/2 core cable use for general electrical supply arrangement..

Answer / mansingh

1/2 CORE USED FOR NEUTRAL CONNECTION. IF ELECTRICAL LOAD IS
BALANCED THEN NO LOAD WILL BE ON NEUTRAL, IF LOAD IS
UNBALANCED THEN UNBALANCED LOAD WILL GOES THROUGH
NEUTRAL.SO FIRST WE SEE THAT LOAD IS BALANCED IN PHASES
THEN IN THIS CONDITION NO CURRENT WILL FLOW THROUGH
NEUTRAL,SO NOT REQUIRED FULL CORE.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is main difference between live tank and dead tank current transformer?

2 Answers   Atul,


What is the difference between IS:1554 (Part 1)/1988 & IS:694/1990 ? What do these two standards specify about?

2 Answers  


What is the maximum number of swithes that can be connected in series up to down stream point in an LV Distribution system?

0 Answers  


in transformer star connection with neutral are shorted. is there is any effect.

1 Answers  


Why in DC drive u r using in Klin operation in Cement Plant?

7 Answers  


is there any concept of armature reaction in Induction motor?

4 Answers  


How do you determine the size of transformer radiators in a transformer?

0 Answers  


i am completed my degree(B.E EEE) 2014 anychance to get electrical licence plz help me

0 Answers   JLL,


How to work meggar?

0 Answers   Anand I-Power,


Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT

0 Answers  


what is the disadvantage of lagging power factor & why ?

2 Answers  


What happent when a AC motor(no break and starters ) stop and suddenly start . ? Starting current low or high?? Why?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)