DEAR ALL
I have motors ( 10 units )each one is 90kw 380V 50 HZ 1000rpm
but new local pwer is 220v 60 hz
requierd rpm should be 1000
pleas what the beast solution is used frequncy converter or
rewinding all motos or chang all motors
thanks

Answers were Sorted based on User's Feedback



DEAR ALL I have motors ( 10 units )each one is 90kw 380V 50 HZ 1000rpm but new local pwer is 220..

Answer / s.sakthivel perambalur

DEAR NOW AUTOMATIC FREQUENCY DRIVE AVAILABLE UPTO YOUR
REQUIREMENT (SIEMENS MAKE)

Is This Answer Correct ?    3 Yes 0 No

DEAR ALL I have motors ( 10 units )each one is 90kw 380V 50 HZ 1000rpm but new local pwer is 220..

Answer / shoeb

yuo need two cdevice one is auto transformer from which yuo
can adjust the voltage and other is cyclo converters whisc
can vary that 60hz frequency to 50 hz

Is This Answer Correct ?    3 Yes 0 No

DEAR ALL I have motors ( 10 units )each one is 90kw 380V 50 HZ 1000rpm but new local pwer is 220..

Answer / k.prakashchandra

VFD/ gear box is mandatory as 1000 rpm can not be the
synchronous speed with supply at 60Hz.

Is This Answer Correct ?    1 Yes 0 No

DEAR ALL I have motors ( 10 units )each one is 90kw 380V 50 HZ 1000rpm but new local pwer is 220..

Answer / anjireddy boduggam

It is mandatory to install two devices:- 1) one device for
voltage adjustment 380v/220v 2)second device for HZ
Converter from 50hz/60hz, but as per technical knowledge
better to change them to suitable motors for 380 Volts / 50
HZ as the cost of Transformers (9nos.) and frequency
converters(50 HZ./60 HZ.) is more than the requirement.

Is This Answer Correct ?    0 Yes 0 No

DEAR ALL I have motors ( 10 units )each one is 90kw 380V 50 HZ 1000rpm but new local pwer is 220..

Answer / kj

The existing motors cannot be used. Voltage and frequency
is wrong.
The second issue is the speed - 1000 rpm uses a 6 pole
motor at 50Hz. 6 pole at 60Hz is 1200 rpm and 8 pole is 900
rpm.
You will need to change the voltage and frequency.
If the motors are belt drive changing the ratio of the
pulleys will fix the problem of speed.

Is This Answer Correct ?    0 Yes 0 No

DEAR ALL I have motors ( 10 units )each one is 90kw 380V 50 HZ 1000rpm but new local pwer is 220..

Answer / k m sarafuzzaman

We Have to instolation A step up transfarmer.

Is This Answer Correct ?    1 Yes 5 No

Post New Answer

More Electrical Engineering Interview Questions

In industries Power factor is maintained by installing a suitable KVAR bank, How is the PF maintained for domestic use, where is the capacitor bank connected

3 Answers  


Two electrically operated Vibro Motors are fixed in parallel direction in vibrating feeder. What is the direction of both Vibro Motors?

1 Answers  


What is the difference between a Root Locus plot and a Bode plot?

0 Answers   GE,


If you know per phase current and phase to phase voltage; what is overall KW of the circuit?

1 Answers   ABC, GAS,


What is EMC filter in VVVF Drive ?

0 Answers   Bengal Energy,






IS diode and blocking diode are the same?..what is meant by blocking diode

1 Answers  


Why  we are always  only used 11 kv.  , 22 kv ,33kv      in transmission line? Why not use 25,  55 ,65 kv ?

3 Answers   Khidmah LLC, Precision Camshafts Limited,


What is the main uses of VCB & ACB?

2 Answers  


why buchholz relay installed in inclined position

3 Answers   Eskom,


when transformer oil should be filtered/tested?

3 Answers  


WE HAVE A LOAD OF 55KW MOTOR ITS VOLTS 380 3PH AND ITS TAKING 100AMPS (ITS FULL LOAD IS 105AMPS)AND ITS CABLE IS 4CX50SQMM ,NOW ITS GETTING ABNORMAL HEATUP IN CABLE,PLZ TELL WHY ITS HEAT-UP?(CABLE LENGTH IS 15 METERS ONLY)

10 Answers  


What is the generating voltage of a power station consided generally?

20 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)