Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Define road.

Answers were Sorted based on User's Feedback



Define road...

Answer / samyak

a road is smooth paved surface which serves the safe,efficient and timeless transportation of vehicles from one destination to another

Is This Answer Correct ?    5 Yes 0 No

Define road...

Answer / manan

A road is a thoroughfare, route, or way on land between two
places, which typically has been paved or otherwise improved
to allow travel by some conveyance, including a horse, cart,
or motor vehicle.

Is This Answer Correct ?    2 Yes 0 No

Define road...

Answer / dileep barnwal

A road is a route,or way on land of safe and efficient transportation of goods and way of good communiction.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Is the ratio fixed for M-20,M-25,M-30,M-35....grades of concrete??

2 Answers   Ahluwalia Contracts, L&T,


how to calculate no. of cement bags consumed in 1:4 and 1:6 proportion RR Masonary and the quantity of sand also

3 Answers  


Why the name is "partial safety factor" why not "safety factor"?

0 Answers   Engineers India Limited,


In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?

0 Answers  


Plan and schedule for 14 towers of 6 floors each with 6 flats on each floor?

1 Answers   L&T,


estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?

0 Answers  


What is the technical name for aggregate stored in trepizoidal shape near railway station.

4 Answers  


mean of NH4 pipe

1 Answers   GVK, L&T,


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

0 Answers  


for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how

1 Answers  


HOW TO PARKING SPACE HS CALCULATED IN MULTISTORY BUILDING?

1 Answers  


What is passive earth pressure ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)