Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the burdon in case of relays?



what is the burdon in case of relays?..

Answer / antaratara ghosh

It is the impedance of the secondary circuit in ohms and
power factor..the burden is generally expressed as the
apparent power in volt-amps absorbed at a specific power
factor and at the secondary rated current...

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

why anti pumping relay is not given to tripping coil of the breaker? why only to closing coil?

2 Answers   INEL, Siemens,


What is meant by line losses, how do you prevent the losses?

3 Answers  


transmisancy eficencey calculation formula

1 Answers  


What is meaning of DRU in gen.of AVR.

2 Answers  


how can electricity is produced without water

6 Answers   Bescom,


I have 4 DG set with 1500KVA rating. system breakers are 11KV & alternator are 415 Volts. i want to Know what is max. resistance for body earthing & 415 & 11KV V Neuteal earthing. my fault current is 14 times for 2 sec.

2 Answers  


Why two nos. un-tensioned wires are placed inside the PSC poles used by powergrid in RGGVY works.

2 Answers   Bhel, Power Grid,


why transfromer rating gives in MVA Or KVA? Why not in MW or KW?

6 Answers   GIL, Siemens,


it is used to measure the potial difference between two point?

2 Answers  


what will happen when ac is applied resistor,inductor,capcitor?

1 Answers  


I am applying for NTPC examination.Can we please provide previous paper to my mail prasad.chintala108340@gmail.com

0 Answers  


What are the neccessary safety arrangements before commissioning of HV substation?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)