why wire mesh is used in plastering
Answers were Sorted based on User's Feedback
Answer / shrikant
For avoid the crack between Brickwork and rcc
| Is This Answer Correct ? | 40 Yes | 3 No |
Answer / manoj kumar bhola
To avoid the crack formed due to insufficient gap filling between RCC AND BRICKWORK joint.Therefore we used wire mesh or said as chicken mesh in plastering and also due to this there will a proper bond formation between RCC AND BRICKWORK.
| Is This Answer Correct ? | 28 Yes | 3 No |
Answer / er. ashish sharma
For avoid the cracks between RCC & Brick work & developing
bonding strength in plaster.
| Is This Answer Correct ? | 20 Yes | 3 No |
Answer / sandeep kashyap
because the density of brickwork nd rcc are different so due to this cracks are occurs in between rcc nd brickwork .For avoid the crack between Brickwork and rcc
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / manseta
We give plastic mesh in place of metal that is plastic re I force mesh. Prevents crack in plasterboard a latter stage
Contact +91 9898 222 222
| Is This Answer Correct ? | 0 Yes | 3 No |
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
wheather Micro silica/silica fumes is an ad-mixture or accelerator.
best hand book for civil engineers with practical criteria
strength vs shape factor
Differentiate first angle & third angle projection?
Why silt content not allowed more than 6% for Sand ?
A building wall is to be constructed , its 12 ft high and 40 ft long and labour cost per foot is 100 rupees , tell me the total cost of labour for that building work plz explain answer ..I am hurry plz any one give me ans as immediately as possible Thanx
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
Brick is fire resistant than stone because––
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)