why wire mesh is used in plastering
Answers were Sorted based on User's Feedback
Answer / shrikant
For avoid the crack between Brickwork and rcc
| Is This Answer Correct ? | 40 Yes | 3 No |
Answer / manoj kumar bhola
To avoid the crack formed due to insufficient gap filling between RCC AND BRICKWORK joint.Therefore we used wire mesh or said as chicken mesh in plastering and also due to this there will a proper bond formation between RCC AND BRICKWORK.
| Is This Answer Correct ? | 28 Yes | 3 No |
Answer / er. ashish sharma
For avoid the cracks between RCC & Brick work & developing
bonding strength in plaster.
| Is This Answer Correct ? | 20 Yes | 3 No |
Answer / sandeep kashyap
because the density of brickwork nd rcc are different so due to this cracks are occurs in between rcc nd brickwork .For avoid the crack between Brickwork and rcc
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / manseta
We give plastic mesh in place of metal that is plastic re I force mesh. Prevents crack in plasterboard a latter stage
Contact +91 9898 222 222
| Is This Answer Correct ? | 0 Yes | 3 No |
what is w/c ratio in dry lean concrete for m10 mix design
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.
what is the unit of heat of hydration?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
what is the difference between compaction and consolidation??
what is the use in canals of longitudinal drains and cross drains in lining areas?
appsc AEE'S interview questions wanted
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
cinder filling or Brick Aggregate filling in sunken portion.which one is better
1 Answers Chenab Valley Power Projects,
how bridge design is to be start? what is the preliminary step for design? which code of practice is to be used for design? what r the methods used for design? what r the ivestigation r carried out? what r the design criteria for design and loading conditions?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)