Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the procedure to make compressive strength test for
concrete cube in lab

Answers were Sorted based on User's Feedback



what is the procedure to make compressive strength test for concrete cube in lab..

Answer / joel soans

The procedure is to test it in compression testing machine or UTM, for 7 days ,14 days and 28days and if required for 45 days, when the previous results are not satisfactory.
Compression testing measures the amount of compression which can be resisted by the cube and can be read in dial gauge or digital meter of the machine...The crushing of concrete cube at the certain pressure or compression resembles its crushing strength or compressive strength in N/mmsq

Is This Answer Correct ?    10 Yes 1 No

what is the procedure to make compressive strength test for concrete cube in lab..

Answer / vinoth kumar

To prepare the concrete mix for example M20 grade concrete,
to attained the strength in 28 days curing period, after to
check the compressive strength of concrete.

Is This Answer Correct ?    4 Yes 0 No

what is the procedure to make compressive strength test for concrete cube in lab..

Answer / sjtbehera

to test the compresive strength of concrete, a copmreesive
test machines avaliable in the market. generally pressure
are devlop by hydraulic jack. A cube 22.5 x22.5 square cube
mould ara availabe. this mould will fille up by concrete
and immersed in water 24hrs.. after this cube are test at 7
days and 24 days mould. A pressure gauge is on testing
machines. the mould are keep under pressure and give
pressure when moulds are break. The moment of breaking
mould see the pressure delvop by machines. it is usally
expresse in kg.cmsq. you can convert it N/mmsq.
this is the funda if compressive strength testing machines.

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

i want to make this calution for making a buliding but i dont know the formula for this and also how much cement concrete an sand use for this calculation,calculation is below(100ft lenths 75ftwidth and 100mm thikness)plz brife the calcution thanks

1 Answers   Sobha Developers,


types of survey and levelling instrument ?

0 Answers  


density of flyash

4 Answers  


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

0 Answers  


17. What is the thing that can disappoint you while working for a certain employer?

3 Answers   Cadila,


which grade of concrete is the strongest? M20,M25,M30,M35 or M40?

41 Answers  


2. What are the grades of steel used in the concrete design?

6 Answers   MEIL, PECL, Ramky,


define the strength

0 Answers  


States some of the tool bars used in cad?

0 Answers  


Heat gain in buildings is best resisted by

6 Answers   AIEEE, B Arch, JMC Projects, Unique Dream Builders,


how much lenth of a bar increase when it bends at 90 degree.

5 Answers  


Can any one give me any link to download civil engineering code in free ?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)