Follow Our FB Page << CircleMedia.in >> for Daily Laughter. We Post Funny, Viral, Comedy Videos, Memes, Vines...


• How will you be evaluated at Petro Star Mount, and how
often?



• How will you be evaluated at Petro Star Mount, and how often?..

Answer / rakesh.r

None

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Mechanical Engineering Interview Questions

PLESE SEND ME OLD TECHNICAL N APPTITUDE QUESTION PAPERS

0 Answers   HPCL, TCS, Urjanet,


what is mean by Hydraulic Overload in presses

0 Answers  


Dfine the density of plastic?

0 Answers  


what is the purpose of fusible plug in boiler and where it is located

8 Answers   Adani Power,


Can anyone explain Things gone right(TGR) and Things gone wrong(TGW) in the APQP process? preferable With example.

0 Answers  






HOW THE POWER INTERMEDIATE WITH TON OF REFRIGERATION(TR) COMPRESSORS ? HOW THE POWER IMPORTANCE TO COMPRESSOR FOR THE LOAD ?

2 Answers   Sanmar,


we have read that when the piston goes up and down then the engine works i.e. the suction,compression etc etc. then what happens in the case of big vehicles, which start at stable condition, i.e. how does their piston moves when they are at rest. how suction,compression etc

5 Answers   Bhel,


What is the basis of selection of type of pump (Centrifugal, Vertical Turbine)

2 Answers   DAE, DCSEM, Energy Plus,


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

0 Answers   Saudi Ceramics,


What is the selection criteria of Natural Draught Cooling Tower and Induced Draught Cooling Tower . Where we prefer NDCT and where IDCT.

4 Answers   IRCTC, Lanco,


Which heating value is indicated by a calorimeter and why ?

0 Answers  


what is the techanical difference between german standard & japanese standard.

0 Answers  






Categories
  • Civil Engineering Interview Questions Civil Engineering (5075)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4444)
  • Electrical Engineering Interview Questions Electrical Engineering (16603)
  • Electronics Communications Interview Questions Electronics Communications (3915)
  • Chemical Engineering Interview Questions Chemical Engineering (1092)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (214)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (258)
  • Instrumentation Interview Questions Instrumentation (2991)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (123)
  • Power Plant Engineering Interview Questions Power Plant Engineering (170)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (0)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1377)