what is relation between SPT N value and driving piles after
conducting a soil test?
No Answer is Posted For this Question
Be the First to Post Answer
what is the productivity in aluminium shuttering per day
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
what is the IS code no. for concrete wastage?
The resultant upthrust on a body partially immersed in a liquid acts through?
5 Answers TNPSC Tamil Nadu Public Service Commission,
Explain creep?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
Quantity of cement in kgs for different proportions and different thickness in plastering work per 1 sq.m. And how to estimate this quantities.
2 Answers Al-Jaber, IVRCL, L&T,
what is E <MOE> VALUE FOR WOOD
plz tell.. how can we find weight(in kg) of 1 cum of m20 mix..? how can we find the ratio of cement sand and agregate on site i.e if we given some amount of m20 mix then hw we find the ratio..?
Why we are using coarse sand for brick work and is there any technical problem if, we use fine sand instead of coarse sand.
What is difference between ceramic and vitrified tile
wat is the proportion of M40?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)