Answer / babu
In the Scheduler we have option called Customized Report. by
selecting Days(s)option in Repeat every option,u can see
Daily Frequency options so select the Run Every option
particular Hours(Gap betwen every run of the WF) your
workflow want to run,after thatselect End after(3 runs)
option of the listin End Options in the main Scheduler tab.
Thanks,
Babu
8861145051
| Is This Answer Correct ? | 3 Yes | 0 No |
SRC1 -> EXP -> AGGR -> TGT SRC2 -> EXP -> Above is a maaping with two pipeline connected to the taret TGT. Design wise is this design is correct or not ?
scenario: dept_no emp_nem 10 A, 10 B, 10 C, 10 D, 20 P, 20 Q, 20 R, 20 S output: dept_no emp_nem 10 A, 10 AB, 10 ABC, 10 ABCD, 20 ABCDP, 20 ABCDPQ, 20 ABCDPQR, 20 ABCDPQRS
How will you update the first four rows and insert next four rows in a mapping?
How do you join more than 3 flat files in informatica?
what is the exact meaning of domain?
Suppose we are using a Dynamic Lookup in a Mapping and the commit Interval set for the tgt is 10000. Then how does the data get committed in the lookup if there were only 100 roows read from the src and the dynamic lookup dint have the 100th row in it?
111111111111ravi11111111kumar11111111111? i want display ravi kumar using sql?
How to extract sap data using informatica?
what are the deliverables?in your project?
Can you start a batches with in a batch?
what is unit testing?tell me proceedure
Is there any model difference between ODS and DWH