What is purpose to use relay after digital output module?
Why normally we don't use relay for digital input module?
Answers were Sorted based on User's Feedback
Because digital output module out put lode capacity is low
and use relay then we can incrise the output lode & lode
short ckt proctaction also....
in input module pts not need more current and voltage just
a on-off pules
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / madam.bhupal
Because digital output module out put lode capacity is low
and use relay then we can incrise the output lode & lode
short ckt proctaction also....
in input module pts not need more current and voltage just
a on-off pules.
some time need digital input card also as per req.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / senthil
Digital O/P module used as interface relay(isolation
circuit) between controller to the load. we cannot connect
the controller output to the load side, which may required
high amps to energise a contactor coil or etc.,In this way
controller is not get loaded.
| Is This Answer Correct ? | 3 Yes | 2 No |
business plan for 100 machines in a bulding showing differeng allocation of network devises?
how can LED bulb indication work correctly without CT OR PT for 3 phase indication if one is cut then it will show the correct indication?
How we install and terminate the wire of pressure transmitter and temprature transmitter. Give full explanation.
What environmental controls?
What is the formula for converting litre in to pale?
What is DHCP & work?
WHAT IS SETUP TIME,OPERATION TIME
if salary paid per month rs. 50000/- of male <65 i will deduct tds from his salary please what i will do explain?
To heat up 275ltrs. water upto 90 degree what is the capecity of heater required?
if zero ohm is not adjusted on shorting the two terminal of multimeter what does it indicate
what casues little rust pockets to pop through or off concrete cylinder blocks (home)?
What you know about ISO 9001? What is quality management system? Weather QMS is suitable,adequate and effective or not? Is there any Quality Policy? Is there any Quality Objectieve? If yes, then what are they. How they are planning to achieve Quality objectives? Weather they are measuring quality objectives?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)