how many no of light weight solid blocks of size 600x200x200mm
required for 1cum of block work
Answers were Sorted based on User's Feedback
Answer / amit
first of all mortar quantity has to be calculated.
it comes b/w 15% to 17.5% of total block work.that means 0.15 cubicmeter to 0.175cum.therefore
Actual quantity of Blocks required=1-0.15=0.85cum
hence Nos of blocks=0.85/(0.6x0.2x0.2)=36 blocks
2 to 3% wastege= 1 blocks
thus total quantity=36+1=37 blocks
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / v nagarur
1cubic meter/volume of cube gives us number of bricks,so, for,
600*200*200
1/0.6*0.2*0.2=41.66=42bricks
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / amit
after considering mortar quantity & wastage=40 blocks
| Is This Answer Correct ? | 0 Yes | 1 No |
hai,i completed my b.tech civil.Recently i wrote the appsc exam for managers water supply engg.I want answers for general studies and civil engg paper2.If any body know or written that exam send to my mail id is ruksana.sk08@gmail.com.
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
how to calculate the steel?
how to calculate the weight of bending wire for 1sqmts .how much bending use for 1ton steel
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
what is the mix design for M45 concrete
How do you convert wind speed into force?
what u mean by M20
9 Answers Srinidhi Constructions,
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
1.DIFFERENCE BETWEEN NOMINAL MIX AND DESIGN MIX? 2.WHAT IS MEANT BY STRUCTURAL DESIGN? 3.IN STAAD WHY WE RELEASE MOMENT TO A MEMBER? 4.ON WHAT BASIS PARTIAL FACTOR OF SAFETY ARE DECIDE?FROM THE LOAD COMBINATION? 5.WHY WE PROVIDE EXTRA BAR & DEVELOPEMENT LENGTH AT TOP? 6.FULL FORM OF SPT & SMB? 7.WHAT IS MEANT BY ITP IN A CONSTRUCTION PROJECT? 8.WHAT IS LEAST COUNT OF THEODOLITE SURVEY? 9.WHAT ARE THE CAUSES OF FAILURE OF FOUNDATIONS AND REMEDIAL MEASURES? 10.WHAT ARE THE VALUES OF COMPRESSIVE STRENGTH? 11.STEEL CALCULATION FOR FOOTING,BEAM & SLAB? 12.WHAT IS MEANT BY GANTRY GIRDER? 13.IN SITE HOW WE CAN IDENTIFY THE ONE WAY, TWO WAY SLAB? 14.DIFFERENCE BETWEEN ANCHORAGE LENGTH & DEVELOPEMENT LENGTH? 15.BEARING CAPACITY OF STEEL SHUTTERING?LOAD CARRYING FOR SHUTTERING?
what is meant by structural design
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)