how to estimate the earthwork,earth-filling for an isolated
foundation
Answer Posted / ramcharan
Earth quantity = aria isolated footing + working margin
Earth filling quantity = earth quantity _ isolated footing
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
five requirements of infill panels for walls?
(Project Management Topic) What are the important criteria in the successful realization of the project?
How is calculate the cube molt
In earth work 1300 cum soil how to calculate how many liters require in water
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
Which architectural movement is also known as jazz moderna?
What is gravity flow?
Which percentage of carpet area use in plot area of office building.
Bernaullis theorem deals with the law of conservation of mass momentum energy none
why the openings of sieves are square io size?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
how to calculate spacing rod in column
what is the type of earthing
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?