Answer / k bu.babu

brick size with motor
20cm*10cm*10cm

=1 cu.m/(0.20*.1*.1)=500no.s

Is This Answer Correct ?    57 Yes 0 No

how many bricks are requir for one unit ho we will caculate..

Answer / vikas

consider, brick size with morter 20cm*10cm*10cm
no. of bricks= 1/(0.20m*0.10m0.10m)
= 500 no.

Is This Answer Correct ?    13 Yes 2 No

how many bricks are requir for one unit ho we will caculate..

Answer / vijayaraj24

1 cum of brick work required 500nos of brick.

Is This Answer Correct ?    12 Yes 2 No

how many bricks are requir for one unit ho we will caculate..

Answer / r.samuel selvadurai

No, The Quantity of mortar should be deducted in the
Brickwork Quantity . So it will be 420nos.,/1Cu.m

Is This Answer Correct ?    7 Yes 2 No

how many bricks are requir for one unit ho we will caculate..

Answer / col baldev singh

1 cum of brick work requires 500 bricks but adding 10
percent wastage actualy it requires 550 bricks

Is This Answer Correct ?    4 Yes 2 No

how many bricks are requir for one unit ho we will caculate..

Answer / chinnasamy.

One brick size with mortor=20*10*10cm
One brick volume=0.2*0.1*0.1m
=0.002m3
Req for 1m3 =1m3/0.002
=500nos
Quistion for 1unit
1unit=2.83m
1unit no of brick =2.83*500nos
=1415nos

Is This Answer Correct ?    3 Yes 2 No

how many bricks are requir for one unit ho we will caculate..

Answer / shunmugapriya

550 to 500

Is This Answer Correct ?    5 Yes 7 No

how many bricks are requir for one unit ho we will caculate..

Answer / krishna

700 (or) 728

Is This Answer Correct ?    0 Yes 3 No

how many bricks are requir for one unit ho we will caculate..

Answer / k.sathiyaraj

1500 Nos are required for one unit

Is This Answer Correct ?    1 Yes 14 No

Post New Answer

More Civil Engineering Interview Questions

Which pavement is advisable in India?(Flexible or Rigid)

6 Answers  


why only water cement ratio always......why not water sand ratio while making concrete

2 Answers  


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

0 Answers  


in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.

0 Answers   Apex,


Whats maxi. slump of M-7.5 Concreit for PCC

2 Answers   Indiabulls, Swastik Group,






why do we provide haunches in rcc box or underpasses?

0 Answers  


minor loss due to sudden contraction 1>flow contraction 2>Expanssion of flow after sudden contraction 3>cavitation 4>boundry friction

1 Answers  


what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper

4 Answers   CPWD,


What is the mixing ratio of M7.5,m10,M30,m35&m40?

15 Answers   Reliance, Umiya Construction,


which is the cheapest type of temporary flooring(say for using 6 months on)?

1 Answers  


why shear reinforcement is not provided in the design of footing?

2 Answers  


How many modular bricks are required for 1 cubic meter of brick masonry?

14 Answers   ITI, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)