i am BSEE student, my project study is to synchronize the
generator of an hospital, it have a one 313KVA standby-power
diesel gen.,and three 100kva transformer.The generator
system is operated manually and no ATS or UPS. one more new
building is being build so the transformer will be upgrade
to a higher vale.
1)how i can connect the new gen. to the old gen. and to the
synchronize panel?
2)what is the new gen. to be buy?(rating, etc.)
These is my title: To synchronize the generator system of
the ____ Hospital.
Anyone have a good title?
Thanks.
Answer / kpd
What are you synchronising to? Are you synching to another
generator for load sharing or synching to the mains?
If mains are you synching for export or are you back
synching for bumpless (or no break) return to mains on
restoration? Arew your site transformers fed from the same
ring? If not you'll have all kinds of issues.
Either way the big thing to get in there is your very
expensive G59 testing and approvals before any DNO will
allow any synchronisation. Also the protections in your
generator control to prevent any out of parallel closing to
mains (makes a BIG mess) check syncs etc etc
| Is This Answer Correct ? | 1 Yes | 2 No |
why in scott connection of transformers, main transformer is tapped at 50% and teaser transformer at 86.6%?
5 Answers Bhel, Bosch, College School Exams Tests, Wipro,
What is the difference between type1 and type2 relay protection co-ordination for motor feeders
why ac supply neutral should earth not in dc (-)
what will happen if OLR CT in all phases are short circuted
What is meant by single line diagram?
HOW TO CALCULATE EHV CABLE SIZING?
what happen if field of dc shunt motor opens? what is function of putting res. in parallel to one phase of 3 phase IM? the power supplied by 5A source in circuit is given by------Watt.
WHAT IS THE REASON FOR THE GROUND PIN IS BIGGER IN SIZE COMPARING TO OTHER PINS?
diff b/w normal grounding and resistance grounding
Which type of control system is expensive — closed loop or open loop?
1)which height building required lightning arrester? 2)how to calculate the requirement of lightning arrester? 3)what is the pro instrument? 5)how to test protective relay like overload?earth fault relay?
what is the difference between gas group b and gas group c electrical equipment construction wise?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)