After completion of testing process what are the mandatory
documents that a tester can produce?
Answers were Sorted based on User's Feedback
Answer / vishwanath
1, test execution report ,release notes are most important once
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / umesh
1 relese note
2 no of features tested
3 no of bugs found
4 no of critical bugs, bo of major bugs, no of miner bugs
5 no of old bugs fixed (if that is the second relese)
6 no of new features added
7 no of no bugs remaining
8 all the platforms tested ex- operating systems and
browsers and also the hard ware environments tested
9 if that is developed for multiple languages then the no
languages that the software supports and mention the
language names
10 mention the relese engineer name
Is This Answer Correct ? | 1 Yes | 1 No |
You are testing a new feature that includes a builder(wizard)that walks you through the creation of an item.There are 10 configuration checkboxes you can check/uncheck for the item being built.The builder makes you select 3 of these 10 options.You can choose any 3 options. A)How many possible ways could the item in question be created (i.e. how many possible configurations)? Describe the technique you would use to determine this.
i got a bug in gmail the bug was i had saved some data in draft and i forwarded the data to my friend and the data was not present in draft it had move to sent items.what is the sta tus of the bug
Which model should we use and under what scenarios?
what is the difference between smoke, sanity and dry run testing?
How do u test the application without any documents?
Have anyone got the Cognizant manual testing call letter for interview? Pl reply
what are the risk factors in the project? what is the base for testplan and entry criteria ,exit criteria for test plan?
Why did u choose testing why not developing.
what is the difference between Error,Defect,Bug,Failure
If I have written the test cases for Login window . If one new field is added to login window then steps of test case changed in the next build. my question is that should I make change in the steps of previous test case or write another test case with new steps?
Can you explain an application boundary?
What is stub and driver in integration testing ? Explain with example.
11 Answers Accenture, Taleem India,