Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is tha online tapping and offline tappchange?
which side connected primary or secondary and explain ?

Answers were Sorted based on User's Feedback



what is tha online tapping and offline tappchange? which side connected primary or secondary and e..

Answer / virendra joshi

Tapping is privided in the transformer to get the desired
voltage in step.

Generally Primery is used for tapping because usually High
voltage winding is wound on the outer side so that it is
easy to take the tapping on the top of the transformer.

Is This Answer Correct ?    5 Yes 2 No

what is tha online tapping and offline tappchange? which side connected primary or secondary and e..

Answer / bharani

In online tapping, you may change the tapping when the
transformer is working, and in a off line tapping,you have
to shutdown power to the transformer when tapping is changed.

Is This Answer Correct ?    2 Yes 0 No

what is tha online tapping and offline tappchange? which side connected primary or secondary and e..

Answer / kuldipsinh

Tapping always provide in HV side .in xmer online means its automatic raise and down button on tap changer control panel and in off line tap change its physically tap change

Is This Answer Correct ?    0 Yes 1 No

what is tha online tapping and offline tappchange? which side connected primary or secondary and e..

Answer / pankaj dubey

in the on line tapping it is directly changing at
transformer end and in off line we have tappe changer
and the tapping is provided in secondary side only

Is This Answer Correct ?    2 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

What should be the values of settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot) to keep the system in transient state, to keep the system in steady state ?

0 Answers  


While testing LA mast,What are the parameter limits ?

0 Answers   TATA,


What is the diffrence between PL Lamps and CFL Lamps

5 Answers  


WHAT IS LOAD CELL

0 Answers   AP, TATA,


For a Potential Transformer(PT), the primary neutral terminal must be grounded before energization. Why....? What will be heppend if we energize the PT without grounded the primary neutral point? Why..........?

2 Answers  


How does frequency affect KVA rating of a transformer? If a 500 kva, 400 v, 60 hz t/f is to be operated on 50 hz frequency then how will its KVA rating change? a-increase b-decrease c-remains same Also explain why do u think like that.

8 Answers  


What is rccb?

1 Answers  


difference between crane drive and line drive.

0 Answers  


WHY WE USE CABLE JUNCTION AFTER BETWEEN TANSMISSION LINE AND TRANSFORMER

1 Answers   L&T,


Is necessary Protection CT, CLASS - 5P10 fitted at Incomer side of main Breaker ? Why ?

1 Answers  


how can a transformer test by megger?

1 Answers  


Why inductor short on dc and capacitor allow to flow ac?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)