DESIGN PROCEDURES OF R.C.C ELEMENTS

Answers were Sorted based on User's Feedback



DESIGN PROCEDURES OF R.C.C ELEMENTS..

Answer / mizpah

1)Calculation of all require loads such as live load,Dead load,Seismic load,Wind load
2)Apply Load factor
3)Calculate moments from loads
4)From that moment Calculate area of steel according to the structural elements

Is This Answer Correct ?    11 Yes 0 No

DESIGN PROCEDURES OF R.C.C ELEMENTS..

Answer / abdul hai shams

live load, did load, earth quick load,

Is This Answer Correct ?    5 Yes 4 No

DESIGN PROCEDURES OF R.C.C ELEMENTS..

Answer / rajesh singh

live load,dead load,earthquick load,wind load....etc

Is This Answer Correct ?    5 Yes 4 No

Post New Answer



More Civil Engineering Interview Questions

What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

0 Answers  


How much cement ,steel bar, concrete ,required for 416 cum rcc slab

1 Answers   ABC,


What is the ideal size of the living room ranges from small to large size?

0 Answers  


What is the compressive strength of noramal clay bricks and AAC bricks??. which one is better for load bearing wall//

2 Answers   College School Exams Tests,


what is unit weight of steel

11 Answers   RRB,






3 Why do you want to work at our company?

1 Answers   Hyundai,


what is hydrostatic paradox?

0 Answers  


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

0 Answers   First American Corporation, GS Infra, L&T, Real Sociedad,


how the calculatio is taken for shuttering in staircase.

1 Answers   JMC Projects, Tech Mahindra, TechnoArt,


200sq.ft of slab and thickness is 6" in that how much cement are required(bags), sand & aggregates are in cu.m, choose grade of concrete is m20.

4 Answers   L&T,


what is bulkage

1 Answers  


what is meant by civil engineer?

2 Answers  






Categories
  • Civil Engineering Interview Questions Civil Engineering (5075)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4444)
  • Electrical Engineering Interview Questions Electrical Engineering (16600)
  • Electronics Communications Interview Questions Electronics Communications (3915)
  • Chemical Engineering Interview Questions Chemical Engineering (1092)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (214)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (258)
  • Instrumentation Interview Questions Instrumentation (2987)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (123)
  • Power Plant Engineering Interview Questions Power Plant Engineering (170)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (0)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1377)