WHAT WILL DO IN NEW COMPANY,THAT YOU WERE NOT DONE PREVIOUS
COMPANY(RELATED TO YOUR FIELD)
Answers were Sorted based on User's Feedback
Answer / pravee
here i am with my previous companies experience so i can
use good part of that experience with yours so output from
my part will be much better than your expectation
| Is This Answer Correct ? | 14 Yes | 1 No |
Answer / bhakta ranjan paul
i m give my full efforts to tis new company.and try to make
my daily task to do on before time so i can do all extra
work also.
| Is This Answer Correct ? | 6 Yes | 3 No |
Answer / anil kamat
a very very good question ,next question please.
| Is This Answer Correct ? | 6 Yes | 4 No |
Answer / shashank
first of all, i will know about the work work that i should
undertake and then learn it from my colleagues. Then ill
make that work as my passion or hobby and ill keep on
working on it every day and night.
| Is This Answer Correct ? | 5 Yes | 4 No |
What is the mechanical advantage of a double pulley?
The effect of reheating is
what is difference between dry and flooded type chiller?
What is the world's hardest metal?
In a reaction turbine,where the pressure drop will be in fixed blade or moving blade?
Flywheel size for diesel engine in compare with the petrol engine.
What is the diffrent between centrifugal and positive displacement pump
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What are the advantages of gear drive?
Draw a crankshaft and show the parts?
how to calculate steam velocity on tg i/l ?
What is the difference between an electric motor and an electric generator?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)