sir,please give me some exam paper for referance.
Thanks & Regards,
No Answer is Posted For this Question
Be the First to Post Answer
A distillation column separates 10000 kg / hr of a mixture containing equal mass of benzene and toluene. The product D recovered from the condenser at the top of the column contains 95 % benzene, and the bottom W from the column contains 96 % toluene. The vapor V entering the condenser from the top of the column is 8000 kg / hr. A portion of the product from the condenser is returned to the column as reflux R, and the rest is withdrawn as the final product D. Assume that V, R, and D are identical in composition since V is condensed completely. Find the ratio of the amount refluxed R to the product withdrawn D. Hint : Solve the simultaneous equations as follow in order to find the answer (R / D) : 10000 = D + W; 10000 (0.5) = D (0.95) + W (0.04); 8000 = R + D.
In a Furnace arch pressure is more than Hearth pressure,then how flue gas travels to stack
Explain some common piping materials used to transport slurries?
what is the difference between car seal close/open valves and lock close/open valves?
how to improve recovery of product in packed tower(raising ring) recovery of vinyl acetate from VA+WO ( vinyl acetate +waste oil mixture)
ENGINEERING DRAWING - EXAMPLE 18.1 : For a Vernier scale of representative fraction (RF) = 1 / 25, calculate the length of the scale for the reading up to 4 metres.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).
For a given bulk solid how can the particle size distribution be determined?
I HAVE BEEN SELECTED FOR IOCL PANIPAT INTERVIEW,ACCTUALLY IAM DOING APPRENTIES TRAINEE IN CPCL.IAM GOING TO ATTEND THE IOCL PANIPAT INTERVIEW.SO PLEASE HELP ME HOW I PREPARE FOR INTERVIEW BY SUBJECT AND ALSO BY FIELD.
What is the Chemical Formula of Mineral Oil used in Transformer. It is Challenged for all Chemical Engineers.
6 Answers Ambuja, Oil and Gas Jobs,
Calculate the line size for a cooling water line with a volumetric flowrate of 1200m3/h of water. Density of water = 1000kg/m3
Chemical Engineering Material Balance - Three hundred gallons of a mixture containing 75.0 wt % ethanol and 25 wt % water (mixture specific gravity = 0.877) and a quantity of a 40.0 wt % ethanol - 60 wt % water mixture (specific gravity = 0.952) are blended to produce a mixture containing 60.0 wt % ethanol. The specific gravity of a substance is the ratio of density of a substance compared to the density of water. The symbol of weight percent is wt %. (a) Estimate the specific gravity of the 60 % mixture by assuming that y = mx c where y is wt % ethanol, x is mixture specific gravity. Values for m and c are constants. (b) Determine the required volume of the 40 % mixture.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)