Answer / vedprakash uppadhaya

high pressure steam flow in the turbine .which have lots of
pressure & that pressure is used for rotating the turbine
blades. turbine , alternator & exiter are connected to the
same shaft so due to which alternator will also rotates &
elctricity generates

Is This Answer Correct ?    12 Yes 0 No

how steam converted into electricity in power plant..

Answer / pillay

The steam produced by boilers is used to run a steam engine or a
turbine.To this turbine or engine is fitted a generator just like
fitted to a diesel engine.When the turbine or engine is run
electricity is produced from the generator.

Is This Answer Correct ?    2 Yes 0 No

how steam converted into electricity in power plant..

Answer / ashokkumar

High pressure steam , produced by the boiler is fed to the
steam turbine blades through nozzle it tends to rotate the
turbine. In other end of the turbine generator is coupled.
when turbine rotates at the same time generator is also
start rotating. And the Electrical Energy is produced by the
generator.

Is This Answer Correct ?    1 Yes 0 No

how steam converted into electricity in power plant..

Answer / a.ashraif

the stream used in power plant is a type of super heated
stream using this stream only turbine blades are rotated
and power is generated

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

In more then 1 phase bulb will glow are not?if yes then how it will glow?

2 Answers  


What is meant by reset level of the relay?

0 Answers  


why earthing point in the 6amps/16amps socket bigger than the remaining (Phase & Neutral)points.

1 Answers  


what is the effect of power factor in electrical circuit ? if we mainten power factor near about unity (0.999) our energy consumption Units increase or decrease?

11 Answers   Piramal Healthcare,


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

0 Answers  






How to calculate or testing the KW in generator

1 Answers  


why we generate transmit and distribute electrical supply in multiple of 11

6 Answers   NHPC,


How turns ratio test is done in three phase transformers?

2 Answers  


How shall i design a liquid rotor starter

0 Answers  


Our Slip Ring Induction Motor Frequently tripped By Earth Fault While Starting time and in Normal Operation Time also Kindly Let me Know the Reason. Application Ball Mill - Cement Mill

1 Answers  


why contactor not provided between output of VFD and motor?

6 Answers   Siemens,


in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 33v to 430.v.

7 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)