Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how steam converted into electricity in power plant

Answer Posted / pillay

The steam produced by boilers is used to run a steam engine or a
turbine.To this turbine or engine is fitted a generator just like
fitted to a diesel engine.When the turbine or engine is run
electricity is produced from the generator.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many types of motor can be used in washing machine

2152


Convert a star connected network into a delta connected network.

1170


What are unstable systems?

1171


When we use air circuit breaker, it has O/L protection ,time delay SC protection, Instataneous SC protection & ground fault protection. They all have some setting range. But what is the suitable/allowable setting for the above protection which will be safe for the equipment? For example-O/L protection setting have a range of (0.4,0.45,0.5,0.55,0.6,0.65,0.7,0.8,0.9,1.0)xIn Time delay SC protection have a range of (1.25,1.5,2,3,4,6,8,10,12)xIn Time delay setting is 0.02,0.1,0.2,0.3,0.4 Instataneous setting is fixed to 20xIn Gound fault setting is given 100A,300A,600A,900A,1200A This setting are for 2500A ACB. So what will be the basic allowable setting for the above protection? is there any formulae to calculate this<

2204


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7771


what is breathing?

1866


15hp motor wound by 0.9mm & 0.95mm magnet wire. at no load test it draw 4.2A current. Another motor with same condition draw 9.2A current. How can that occur? pls help

1624


what r the checklist while installing a 380 kva DG set

3852


While HT line put on to activate ACB in low tention panel VCB tripping instantly.why it happens

2162


why does a dc machine has high efficiency while working as a generator than as a motor ..

2061


why i can not use thimble on capacitor duty contactor

1400


what is the size of cable for 15kw motor and 85 meter cable length using with vfd

2429


What is Fire Panel ? How it works ?

2123


Draw a SLD of DG distribution up to main LT panel?

9531


why do we not use equivalent voltage source in negative sequence equivalent ckt.

2104