Dear sir my name Ankit i m Diploma holder present working in Welspun Corp ltd Anjar as Asst.engg (salary 14400/month ctc) i Would like to change my company also i have selected in ford India pvt ltd Sanand as trainee Tech with salary 12000/month so please suggest me for changing my job hope for *ve response
2895what is the working principle/operation/theory of 3-phase rectifier power transformer used in cold rolling mills.
TATA,
1 5747Why in Hv transmission line as we see there are generally 6 or more than 4 conductor wires are used instead of 4 i.e. 3 for phase and 1 for neutral wire?????
2 4878Post New Electrical Engineering Questions
BRIEFLY EXPLAIN THE STORAGE CLASSES AND THEIR TYPES IN C
What happens when ac supply is given as excitation voltage instead of dc supply
what id a dry type transformers and its function ?
for what purpose the star point is done in ct
TYPE'S OF BREKAR ,WHAT IS TRANSFORMAR & SAFTY. STARTER DOL & STAR DELTA STARTER.
From past few months I am getting lagging pf even though sufficient capacitors used in circuit. Where is the problem pls answer
sir please send me techinical questions for junior engineer posting in bangalore railway i am diploma holder
HOW CAN YOU CALCULATE PRACTICAL EFFICIENCY OF A ASYNCHRONOUS INDUCTIONMOTOR OF 7.5KW,& MOTOR IS RUNNING WITH AVOLTAGE OF 410 VOLTS,& TAKING CURENT OF 13 AMPS
How can i get my certificate of competency as an electrical supervisor? I have complicated my B.Tech from Uttarakhand technical university this year (2012).
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
what is transient voltage?
1.What is the range of stator resistance of 3-phase induction motor? 2.Two electrically operated vibro motors are foxed in parallel direction in vibrating feeders. what is the direction of both vibro motors?
what is the formula for calculating the phase clerance between two phases and phase to earth how to calculate the cable for a motor
lamination figures
Explain how you intend to work under pressure to meet up with deadline target?