Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Electrical Engineering Interview Questions
Questions Answers Views Company eMail

acsr dog conductor specification

1 4476

generator means

1 3903

in DG synchronization system can i short R,Y,B- phase(DG-1) to R,Y,B Phase (DG-2), HOW IT WORK . WHAY WE NEED TO SYNCHRONIZATION.

1 4301

shall we use a machine having 60Hz frequency in india ? why?

4 6779

Explain M Var? Which types of problem occurs when reactive power increase at the time of full load of plant and at the time of synchronize of plant?

1 1864

What's is the difference between IVT and CVT?

CPCL,

1 17126

Why used in netural grounding transformer for netural side

2 4914

What is drain current of static relay?

1 4016

How to connect surge arrester with equipment?

Godrej,

1 7219

what is the slip of synchronous motor

1 4705

If a rotary UPS is in line through grid power; What would be the impact on Power Factor if the load through rotary ups is 25% , 50% , 75% & 100%. Will the power factor reduce with less load?

1 1955

What Different of Ht Side VCB & SF6

2 5156

what is the difference between fault current ant short circuit current?

LG Soft,

1 2770

We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

1 2066

why in transformers voltage given is in the multiple of 11

3 5718


Post New Electrical Engineering Questions

Un-Answered Questions { Electrical Engineering }

what are the values of VRY,VYB,VBR,Vry,Vyb,Vbr,Vrn,Vyn,Vbn for Magenetic balance test of 100 KVA and 63 KVA Distribution transformer

3057


what is mean by restructuring power system?

2143


please send me the L&T Emb. sys. placement papers and entire details of pattren

2406


hi frenz,its aswathy.i hve aplied for the hpcl test on feb,pls send the test patern & the placement papers as soon as possible. mail-id :kjaswathy@gmail.com

1853


what is earth fault relay 64T, why it is used in main Incomer and neutral CT of Transformer.

3860


I need bhel electrical test pattern & paper

1916


Dear All we are having a problem in G120 BOP showing alarm A0503, F0052, F0060 we can not remove fault alarm ,Please any body help us. kowsar

1953


What the main causes of transient interruptions on Over-Head Distribution Lines?

2214


sir please send me previous year questions of jspl of electrical section through which i could prepare myself fpr the test.

1983


pls,send the previous year written test questions.

1982


Please nybody say, weather the result of Bharat Oman is declared or not? Probable date of declare???????

2087


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

1051


Hi all I had applied for the RRB test in the ELECRICAL category. I would be pleased if any of you can sent me previous year question papers. Please forward the question papers to varshashahi@yahoo.com Thanks and regards Varsha

2237


if any body have question paper of railway (section engineering),then plz send me .i will thank of him/her.

2055


Hello sir, pls send me hpcl technical test papers .i am. Appearing for the exam.

2787