PLEASE ANYBODY HAVE ELECTRICAL CIRCUIT DIAGRAM FOR CHMER PULSE CD 60M SPARKING MACHINE.PLEASE MAIL ME SUPRIYAAYYAPPAN@YAHOO.CO.IN.
2866(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
1916while doing high voltage test on 11kv/433 distribution transformer why we only give 28 kv on hv side and 3kv on lv side for power transformers what is the value what factors it depends
2917Post New Electrical Engineering Questions
Explain cos(theta) and Sin(theta)
How do you calculate the actual power consumption of an inductive load appliance. Say, a deep freezer of 200watts
The capacitive reactance of a capacitor of 1/(2(PI)) F at 10^3 H is
which phase is preferred for connecting 1 phase vt used for synchronizing OHL? WHY?
i need about 10 years of GATE solved papers in pdf format and even mock tests toooo
Define settling time.
What do you understand by external characteristics of a d.c. Generator?
how to measure the current by compact digital equipment with dislay which fit inside any equipment
How to calculate the value of earth capacitance in a transmission line.
What is the main purpose of c.f.b.c.boiler
what do you mean by type zero control sytem ?Give an practical example of type zero contol sytem?
If i am running of spindle at 2000rpm ,but How to spindle stop at the second I am resetting the machine in CNC machines
Why Utility Distribution System in India is mainly at 11 kV? Why not Utility go for 33 kV?
how define the torque in ac drive. from electrical side in the drive friquency ,voltage and current three factor is there.
hello friend i wish to study a course related to the electrical construction, controlling and monitoring , which course i want to study? pls give me the name of institute?