HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT SWITCH BOARD,MLDB,ACB,BUSBAR,ETC...?
3993HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT-SWITCH BOARD,MLDB,ACB,BUSBAR,ETC,......?
2152what is rotatng magnetic field in case of three or multiple phase alternating current machines???
NHPC,
1 4017what is the working principle of Brushed alternator ? without exictation how we can give dc supply to rotor ?
1 4491Totally how much power will be consumed in 1 hour cotinuous running of electric train engine?
L&T,
1 5196i am working in a grid substation,TNEB having 13 yrs experience. Am I eligble to get apply for c licence now?
3 7815I am a possesor of c licence from 1993. I forgot to renew during the year 1998. During that time I was working at TNEB to till date. Is there any possibility to get renewed? or to apply for a new one?
2082Post New Electrical Engineering Questions
hr round
My load is 1635 KW. & current pf is 0.884, I have to improve it for 0.99.Please suggest what KVAR value is needed?
I am having dual speed motor of cromton greaves make of 3.7 KW -1400 rpm and 5 KW - 900 rpm. Please let me know groups and winding connction for rewinding purpose.
why h parameter are called as hybrid parameter?
How to determine the breaking capacity such as break down current and break down voltage for VCB and CT's.
mostly the questions were from machines... d.c. machines, transformer, synchronous and induction all theory paper........ few from power system... but the level of paper was easy.....
Define resonant frequency?
What is contract demand in solar system?
Can anybody post questions asked in Engineers India Limited Interview? Thanks in advance.
Define cut-off rate?
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
IN SINGLE PH TRANSFORMER IF LEKAGE IMPEDANCE DROP IS NEGLECTED ,THE FLUX IN THE MAGNETIC CORE and the lekage flux linking a winding are a)proportional to the applied v to the winding i respectively.
Why Utility Distribution System in India is mainly at 11 kV? Why not Utility go for 33 kV?
How to select batteries required for ups and the inverter if we Known load? And how AH is selected of battery?
how electrical earthing maintenance done in industry?