How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
2641i m searching for steel or rebar weight/meter (d)2/162 this is correct but why used here 162
3 10805I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
2059In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
2280what will be the quantity of following materials in P.C.C for the total area of (100'x70'x 0'4") 1)NO. OF CEMENT BAGS 2)SAND IN CU.FT 3)METTLE IN CU.FT
2622In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
2111please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
1 4641Post New Civil Engineering Questions
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What are the uses of alloys in daily life and how are alloys made?
What are the common ways of demolition?
What are moment of inertia and its importance in civil engineering?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
in one SQM plaster how much Cement and sand consumed in ratio 1:4
How do you calculate the power of a centrifugal pump?
How to calculate canal slope curvature qty!
Define What is a projection line?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
psc girder detail
what is the breaking strength of wall tiles
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?