How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
2675i m searching for steel or rebar weight/meter (d)2/162 this is correct but why used here 162
3 10916I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
2088In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
2322what will be the quantity of following materials in P.C.C for the total area of (100'x70'x 0'4") 1)NO. OF CEMENT BAGS 2)SAND IN CU.FT 3)METTLE IN CU.FT
2654In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
2161please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
1 4705Post New Civil Engineering Questions
What is the method of soil replacement test?
How to take labor charges for construction of 1cum of concrete?
what is the name of shuttering oil used in oman
Why are steel plates inserted inside bearings in elastomeric bearings?
pls give me ans to ACT formula cube testing porpuse
why do we provide haunches in rcc box or underpasses?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
Which is the direction for positive angle?
afe or not
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What is kn measurement?
What do you meant by gui?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].