Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?

843

Please explain soil invistigation methods?

IVRCL,

2 3668

How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete

JSW,

3 5991




How many kilograms of 12 mm coarse aggregate required in cufic feet for one cubic meter of M25 grade concrete

1 4171

1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.

1714

1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

1532

What type of tensile strength is handling by crank in beam? Thanks.

L&T, HD,

1221

Why are we providing crank in beam? Thanks.

2 22150




Is there is any formula for calculate the correct length of rebar while it bending in 45 degree/90 degree and cranking???

L&T, NBCC,

2 7000

what affect on the structure and related beam of slab when provide one way slab insteade of two way slab

2 3584

Hai, I have applied for APPSC AEE (I&CAD) post.I need previous AEE papers of civil engineering.I hope u will kindly consider this and send.

1 4450

how many BSCs can i connect to the HUAWEI MSC

1045

what is meant by skyscapers?

3 3691

How may kgs. of sand make one brass ?

HCL, Kerakoll,

2 12301

What are the specification of good quality sand for plaster and brickwork?

2 4400


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

861


i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

716


I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

707


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

525


How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

739






how much need sand and cement for 1 cft roof construction?

3209


What is meaning of FREE STANDING STAIRCASE ?

1621


please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?

418


why we are useing plastic under the lean concrete?and whts the advantage?

1202


What are new methods /technologies of pothole patching?

1028


please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)

494


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

191


can you give me the details of rate analysis of steel and concrete?

1723


difference between trapezoidal and pedestal footing and how the load acts on that

1525


wat would be the probable interview questions and GD topics for IOCL exam?

7976