how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
6175What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing for M25 design mix conc.?pl give idea with relavant is code
9 36639what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
2083WHAT TYPE OF BINDING WIRE IS USED IN OFF SHORE STRUCTURES. WHEATHER COROSIVE OR NON COROSIVE LIKE EPOXY COATED,PLASTIC COATED ETC.
1 4575a g+2 building having mezenine floor ,but stair is approching only 1st and 2nd floor, in this case stair is calculate in plinth area for mezenin floor or not?
NBCC,
1 6046A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
5 10341what are the diffrent kind of grades in concrete and what does M means while specifyng the grades?
10 29280Post New Civil Engineering Questions
Test procedure of fly ash bricks as per code ?
Describe the sections included in a typical bill of quantities
During reclamation how can the occurrence of mud waves can be rectified?
What are the main reasons for conducting pull-out tests for soil nails?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
how much repeitation for conventional and maivan formwork?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
Explain the water bound macadam roag
explain the rale of the government in the construction industry
what is thumb rule for calculating the size of ISMB required for a particular length of span
what is diffrence between catchment area,watershed and basin?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
How cracks in concrete can be avoided?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high