Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Civil Engineering Interview Questions
Questions Answers Views Company eMail

How much Bentonite is required per Cubicmeter of pile for a cast insitu pile?

CCCL,

3 20357

how to calculate length of bar

4 8655

what is the stripping time of beam?

3 10242

what is penetration test?why it is done?

1 3533

types of piles?

4 8262

parts of stair-case?

3 7192

what is the difference between rcc pipe (pressure or non- pressure)and rcc hume pipe?

1 12199

load combinations how many types for staad design purpose?

Descon,

2162

What is the difference between load bearing and non load bearing walls? How to distinguish both?

IOCL, L&T, TCS,

6 52701

Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

IOCL,

2160

WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

IOCL,

2368

why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..

7 21055

1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?

1 6270

how many days we should curing for plastering,brickwork,concrete?

Al Faraa, Alfaraa, CCCL, Consolidated Construction Consortium Limited, Wipro,

10 73053

what is mean by stripping?

2 8218


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

what is escalation?how it is done?

2507


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

2262


what is pile and deam foundation

2350


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

2455


how to calculate spacing rod in column

1958


how calculate the bearing from two coordinates?

2258


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

2099


about higyway engineering

4419


what is the tensile strength of 10swg and 8swg gabion wire?

2025


Define What are the reasons for geotechnical site investigations in Uganda?

1174


What is the difference between engineering stress and true stress?

1182


where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?

1352


What is the primary difference between adsorption and absorption?

1138


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2777


what is density of 20mm coarse aggregate.plz send answer my below adress e.mail

2143