How many no of bars in a bundle of steel and kgs/bundle. 8 mm, 10mm, 12mm, 16mm, 20mm with both MS and TMT separate.
ABC,
15 161518If we know the N - Value of soil and required bearing capacity how do we know what diameter and length of pile to be casted? How can we check whether the dia. and lenght of pile we have selected are most economical onse?
3 4890What is the graphical relationship between N - Value of soil and Dia. of pile when pile length is fixed, and n - Value and length of pile when its dia. is fixed.
1 49581 what is the nature of your job? 2 what major product or service does your company offer? 3 hoiw does the knoledge of chemistry hels in your job?
2 4002IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
NCC,
1257Please let me know the name of university which is offered distance education in BE or Btech in direct 3rd samester????
L&T,
1 2792What is the difference between Autodesk revit structure and STAAD pro.? How much it is useful to structural engineer in modelling, analysis & design of RCC and Structural steel structures than STAAD pro.?
L&T,
3 24804Post New Civil Engineering Questions
What is the method of soil replacement test?
What is the deffrence multistory bulding &highrise bulding
What Reinforcements Are Used In The Process Of Prestressing?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Mention what are the composition of a landfill?
How much percentage of brick bats allowed in CD-75 bricks
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
how much cement sand n bricks required in im3?and how much in plaster?
difference between trapezoidal and pedestal footing and how the load acts on that
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
material used for mendrel use to bend epoxy coated rebar