what is the cover for column,beam & footing?

6 6112

what is singly & doubly rc beam? what is difference between them?

6 16909

types of concrete?

8 7228

what is plum & mass concrete?

Shri Construction,

9 73075

what is working drawing?why it is use?

3 3711

How do you find the weight of rod per metre lenth ?


18 11967

Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??


What is the difference between stress and pressure

3 4094

which"s we should use for concrete ppc or opc?


9 11672

rate analysis of shuttering

2 12879

what is the ratio of M10,M20,M30,M40,M50,M60 grade concrete

SPML, NCC, Student, PWD,

25 183408

what pressure the NP2 class RCC pipe can sustain?


which are the Indian auther books for STONE COLUMN/GRANULAR PILES?


what radial pressure, the NP2 class rcc pipe can sustain?



What is semirigid connections?


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

How much material will consume for following specification water tank (9*7.5*6 feet)?


Which percentage of carpet area use in plot area of office building.


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?


Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard


What should be the lap length in raft if height of raft is 0.800mm couldn't b 50D or 40D...we just have to join upper and bottom there any formula for determine it...


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh


how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...


what is total volume of ingredients used in concrete accordingly


what is the procedure of wet seiving. n percentage of silt in different type of soil?


what is the composition of good brick ?


what is the construction cost for per cft of multistorryed building in kolkata?


Howmuch bend to be provide for 200/600 BEEM


Which IS Code/American Code applied for coupler test of steel