In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
5 12508In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
8 22711why there is need to provide shear reinforcement?give the basic reason?
JMC, L&T, Power Grid,
9 69453In olden days reinforcing bars in concrete are not got rusted even till now. But recently provided steel getting rusted in concrete. what are the probable reasons?
11 17445what is lifespan of an RCC structure? Why the RCC structures failing in quater of its life span?
13 67693Post New Civil Engineering Questions
Differentiate first angle & third angle projection?
What is the origin of name railway sleepers?
What is bylayer?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What is the crank length in the slab?
What are new methods /technologies of pothole patching?
What is absolute pressure? How absolute pressure is calculated?
satart to end steps by step process of building construction...? i want to planning theme accuretly
How many square meter can a worker/labor demolish a structure per day?
how much one carpenter can doing shuttering of slab in one day
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
difference between fc and fc'?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
Define What materials were used to build the Golden Gate Bridge?