qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
2249how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
2855how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t
L&T,
2 8950Post New Civil Engineering Questions
What is a kip?
How to check slab shuttering level.? Or check list for slab ?
Which tests are performed on soil to decide the type of foundation to be provided.
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
What is the likely strength of a 1:2:4 concrete mix?
What is the difference between a wood shake and wood shingles?
What is the cemnent ratio
Why do you want to work here
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Which code is used for tor & tmt steel bar?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
how i can tak Quantity of mortar in block work
What is demising walls?