qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

847

how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

1625

In two way slab where should we stop the work at end of the day?

2 4234




How will you provide reinforcement from corrosion?

2 2546

Water absorption for stone and first class stone bricks?

2 4411

Slump Values for works?

Aditya Constructions, SVS Constructions,

829

why do we provide haunches in rcc box or underpasses?

1644

what is the mixing ratio of the cement mortar for tiles fixing in floor tiles?

NLC, Prakash Engineers,

5 15900




about 200 cubic mtr

719

who to calculate the bar bending schedule?

APPSC,

3 4762

how many 1st class bricks in 1cu feet?

ECCI, L&T, Jayant Group,

27 107265

how to caculate cutting lenght in bar bending schedule for 180 degree bend

L&T, Bhel, NCC,

6 14925

how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t

L&T,

2 5819

how to distinguish TMT n Tor steel?

2 4457

why you are selecting the civil engineering

Sobha Developers, gdcl,

4 4836


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

845


sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].

892


What is the cost difference between site mix and ready mix concrete per cubic meter

640


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

9832


DO YOU HAVE REFERENCE LIST?

865






In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

931


WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT

1103


What are your future hopes for this job?

812


how to calculate reinforcment in staircase cranked beam?

1219


what is the construction cost for per cft of multistorryed building in kolkata?

944


How to get MEP technical,instaaltion & testing data for interview?

785


How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?

443


why we create short columns under grade slab?

1017


I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??

906


#include main() { int a=300,b,c; if(a>=400) b=300; c=200; printf("\n%d%d",b,c);

1250