qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

774

how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

1571

In two way slab where should we stop the work at end of the day?

2 4115




How will you provide reinforcement from corrosion?

2 2436

Water absorption for stone and first class stone bricks?

2 4318

Slump Values for works?

Aditya Constructions, SVS Constructions,

772

why do we provide haunches in rcc box or underpasses?

1577

what is the mixing ratio of the cement mortar for tiles fixing in floor tiles?

NLC, Prakash Engineers,

5 15320




about 200 cubic mtr

674

who to calculate the bar bending schedule?

APPSC,

3 4641

how many 1st class bricks in 1cu feet?

ECCI, L&T, Jayant Group,

27 102040

how to caculate cutting lenght in bar bending schedule for 180 degree bend

L&T, Bhel, NCC,

6 14680

how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t

L&T,

2 5613

how to distinguish TMT n Tor steel?

2 4337

why you are selecting the civil engineering

Sobha Developers, gdcl,

4 4654


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

Scaffolding IS code NO.

935


how to nfind out the specific gravity of sand.aggregate,water please help...

685


How to compute minimum number of columns required for a site from area of site?

708


Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice

1275


Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

1698






what could be the production cost of 1 cum of concrete by CP30 plant

395


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

836


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1067


what is the calculation of raw material for 0.35cum of m-15

117


cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?

1002


give me the rate analysis for Bituminous Macadam and SDBC

4664


relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2

848


I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'

716


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

877


What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...

591