qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

913

how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

1680

In two way slab where should we stop the work at end of the day?

2 4353




How will you provide reinforcement from corrosion?

2 2655

Water absorption for stone and first class stone bricks?

2 4532

Slump Values for works?

Aditya Constructions, SVS Constructions,

893

why do we provide haunches in rcc box or underpasses?

1704

what is the mixing ratio of the cement mortar for tiles fixing in floor tiles?

NLC, Prakash Engineers,

5 16478




about 200 cubic mtr

791

who to calculate the bar bending schedule?

APPSC,

3 4885

how many 1st class bricks in 1cu feet?

L&T, ECCI, Jayant Group,

27 109640

how to caculate cutting lenght in bar bending schedule for 180 degree bend

Bhel, L&T, NCC,

7 15237

how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t

L&T,

2 5996

how to distinguish TMT n Tor steel?

2 4583

why you are selecting the civil engineering

Sobha Developers, gdcl,

4 4975


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??

677


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

347


How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

2337


i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need

1120


How is calculate the cube molt

809






manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

646


why demand factor less then 1 ?

983


why we create short columns under grade slab?

1078


What is thumb rule in quality and quantity estimation of a Residential building??

412


who to find building iron rod strenth

832


CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL

931


what is the types of door's wood?

826


can you provide a link for manual design of building?

404


hi guys what happens if you are absent for a supplymentry exam?

491


Dear Sir What is the Contraction joint for base Slab

861