if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
2138if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
2142what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
2575How to calculate the lap length rod of column, Beam,Slab please give me a details?
Ali Baba Engineering and Construction Company, Asha Realty Developers,
4 71155Post New Civil Engineering Questions
Specific gravity of cement?
how is the reinforcement is distributed in triangular slab
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
What is chemical composion test
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
can you give me the details of rate analysis of steel and concrete?
to draw bm diagrams for portal frames under different loadings//
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
Define What is passive earth pressure ?
what is diffrence between catchment area,watershed and basin?
what is idealized curve for concrere and steel
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir