Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)
what are the disadvantages in GIS over AIS
how a DPAD converts voltage to current?
What are the differences between combinational circuits and sequential circuits?
how to determine the inrush current of a transformer
Why the aspect ratio of tv video display is 4:3 or 16:9?
What is the purpose of ventilation in the battery room?
What is HSN? How do we apply it?
How can you keep our seawater used for heat rejection clean before entering our heat exchangers?
what is different between phase and netural
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
Test on three subjects Physics, Chemistry & Biology are to be conducted simultaneously the number of candidates for the tests are 68, 36 and 72 respectively. Candidates are to be seated in different rooms such that each room will have candidates of the same subject and the load on each invigilator be the same i.e. the number of candidates in each room should be the same what is the minimum number of rooms you need for the purpose
Best way to measure the Soil resistance of rocky soil, three probe method and four probe method
wheather the size of windings in motor and generator are the same
If any HVDC line is going with positive & negative(the negative usually have return path of current with earthing electrode). Now the question is if this HVDC earthed electrode which is using as return path and earthed any nearby 400kv or 220kv AC substation equipments. which will be the impact of this on AC substation & its equipment, how severe may be this and what should be the minimum distance require between HVDC earthed electrode and AC substation equipments? It's really an high engineering level question...Dare to answer and increase your knowledge.
What are the components of feedback control system?