Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) While there, are many tests available to detect leaks on vessels, is there a technology available to quantify the leak, or measure the flow through a leak?
1178When using a pumping loop to mix two miscible fluids in a tank, when can the content are considered well mixed?
1571
Make a ladder diagram on LSL valve will close, on PSL valve will open and start the motor
In parallel operation time both NGR’s close or not close if both close what will happen
Name the operation which can be performed by lathe machine?
I've been running into situations where a relief valve is being used to protect a regulator. Is this common? And, is this a proper use of a relief valve?
What is the difference between EN 8 and SS410 grade material with chemical composition and application.
What is the difference between amorphous core transformer and CRGO core transformer?.
why +24 v and -48 v give to BTS? If -48v protect from surge then why we not use -24 v?
HOW TO CALLICULATE RESITENCE,REACTANCE AND IMPEDENCE VOLTGE OF TRANSFORMER 13.33 KVA 144/240 VOLTS 93/56 A WITH FORMULA
Define trimming?
how we findout a ignater is faulty or not?
How RTCC panel is working and give single line diagram for RTCC with transformer?
i want to know the syllabus for management trainee exam,vizag steel plant,2009
Starting current of a 10 HP induction Motor is ______ time’s full load current.
sir i have 4 year gap in engineering. i would complete my degree b.tech it in 2014. it will be may be in 2nd class.my hsc is also with 2nd class. i am week in programming. Then if i want highest package upto 5-6 lacs then what should i prepare myself as a good engineer to get this package???
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.