Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Areva interview questions (27)
  • Areva technical test questions (16)



Areva Electrical Engineering Interview Questions
Questions Answers Views Company eMail

HOW GENERATING END VOLTAGE LEVEL (6.6 KV/ 10.5 KV/ 11 KV/ 13.5 KV) DECIDED IN POWER PLANT. ON WHAT FACTORS THE GENERATING END VOLTAGE DECIDED, & WHAT IS THE CALCULATION USED FOR THIS.

3 14980

what is the function of breather in a transformer

29 88369

what is the criterion for selecting vector group of Transformers ? i mean how to decide vector group of Generator transformer, substation trasformer and transformer at consumer end

954

what happens when a DC supply is given to AC motor?

9 15655

What is vector group? What is meant by DYN11?Why is it needed?

13 71301





What is Ten Delta Test ?

8 23973

What is Generator Protection & Transformer Protection?

3 7645

WHAT IS THE DIFFERENCE BETWEEN NUTREL AND EARTHING

10 6940

what is XLPE type cable

8 7425

what is difference between c-power & u-power air circuit breaker?

2 14038

phase colour is indicated by R Y B (red yellow blue) but in transformer i have seen U V W instead of (R Y B) have any meaning of this

3 14427

we can stepdown the voltage from 230/12v ,and we use the voltage for various electronics components why can't we step up the voltage from 12/230v if we can shall we use the voltage for domestic single phase supply

5 4436

why current transformer secondary side should be shorted ?

4 7495

how can we change the supply frequency?

8 6193

how can we change the supply voltage?

4 3664

Post New Areva Electrical Engineering Interview Questions



Un-Answered Questions

I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

668


I want my deployment group to refer an external configuration file, while i deploy in the production environment. How can i achieve it.

712


what is the heat insulation material is adaptable for a flue gas duct that carries waste heat from brick kiln to brick drier and what temperature is required to maintain at the tunnel to dry adobe bricks adequately

523


Can any one give a summary of testing a territory management system? what would be the test scenarios, few test cases. how it works.

617


Why Gymnosperms have become less than Angiosperms and What is the evolutionary trend between them?

687






The title of the window consists of date and time.What is the regular expression to recognize the window as unique?

665


what is the core accounts

760


Some operating system have a tree structured file system but limits the depth of the tree to some small number of levels. what effect does this limit have on users? How does this simplify file system (if it does)?

3322


Why acetonitrile and water are used as extraction solvent when analysis melamine? I thought they are miscible and won't be able to separate...

100


In constant power region of 3-phase IM torque-speed characteristics, if frequency increases flux A does not alter B decreases C increases D none of above

801


WHAT WILL BE THE ACCOUNTING ENTRIES IN THE BOOKS IN CASE OF A COMPANY HAVING ITS SHARE CAPITAL WHEN A NEW COMPANY (LTD OR (P) LTD) IS FORMED ?

679


hi ,i need some suggestion,comptd my graduation in 2012,but i wasted my time for 6 month,just i want 2 escape from this question,what u did for 6 months,how can i give proper anser to them?pls suggest me

896


what will be happen if earth point is being used for as a neutral point for raw power , and same will be used for ups earthing

701


In which code the the maximum height of concrete casting has been explained

1279


i need the source code for opening a word document in java

1059






Areva Electrical Engineering Interview Questions
  • Project Management (2)
  • Electrical Engineering (40)
  • Business Administration (1)