why we not using 230kv directly why we are stepping down and
then stepping up
Answers were Sorted based on User's Feedback
Answer / s.ravikumar
NORMALLY THE GENERATING VOLTAGE AT ANY POWER STATION IS 11KV.
THEN THE VOLTAGE(11 KV) HAS BEEN STEPPED UP TO 33KV,110KV,230KV OR 400KV.
THE REASON FOR STEP UP IS TO AVOID THE LINE LOSSES DURING TRANSMISSION AND DISTRIBUTION FROM GENERATING STATION TO THE SUPPLIER END(GENERALLY LONG DISTANCE).
ACCORDING TO THE LOAD AT SUPPLIER END THE RANGE OF VOLTAGE VARIES.
EXAMPLE:
SOME OF THE HOUSE HOLD ITEMS ARE 230V(SINGLE PHASE) RANGE:
1.TV
2.IRON BOX
3.FAN,ETC.
AND SOME OF THE HOUSE HOLD ITEMS ARE 430V(3 PHASE) RANGE:
1.3 PHASE MOTORS
SO IT IS CLEAR THAT EACH ITEM HAS SEPERATE VOLTAGE CLASS.SO WE CANNOT GIVE 230KV TO A 230V ITEM(IT DAMAGES THE INSULATION OF EQUIPMENT AND IF NO INSULATION THEN THE USER WILL SURELY GET DEATH).
,HENCE THE GENERATED 11KV IS STEP UP TO ANY OF VOLTAGE RANGES 33KV,110KV,230KV OR 400KV AND IF REQUIRED THE THAT SAME CAN BE STEP DOWN BY TRANSFORMERS LIKE:
1.400KV/11KV
2.230KV/11KV
3.110KV/11KV
AND 11KV/440V
NOTE:IF THE VOLTAGE LEVEL IS HIGH,THEN THAT MUCH OF INSULATION,GROUND CLEACRENCE HAS TO BE MAINTAINED.
Is This Answer Correct ? | 2 Yes | 0 No |
high voltages are safe method to trasfer power generations
bulk power .
High vloltahe are directly used in iron steel factory arc
furnaces -400kv,230kv to 60,30kv arc furnaces, where
generation source very near or long distace net work.
industries adopt bulk supply.
domestic, medium comsummers are 400v,4W,and 230v -mobile
charger ,tv,washing machines, frinders, .....
Is This Answer Correct ? | 1 Yes | 1 No |
What is the difference between Off line UPS and Line interruptible UPS?
it is clear that volts equal to the current as per ohms law. is it appliable to the AC power or only for DC. if it is appliacable to AC in transformers when voltage increases the voltage decreases ????? why??????????????
why AC signals are represented by sinusoidal waveform?WHY other waveforms not used for representation
WHICH SUPPLY IS BETTER FOR 4 MW LOAD. 1)TO TAKE NEARER AVAILABLE 11 KV SUPPLY OR 2)TO TAKE 33 KV SUPPLY WHICH IS AVAILABLE AT 10 KM DISTANCE BY INVESTING NEARLY 50-60 LACKHS
why we can't use more then 50 hz in india ? Is it possible ?
how to choose the cable rating for load (KW)? EXAMPLE.50KW load
14 Answers ACC, NCUI, Polycab, PowerSol, Siemens, SW,
checklist of ELCB
What are options used for earthing the switchgear.
What is the Frequency while we step up the voltage from 220V to 11KV? Is it possible? Explain it?
what is Basic Engineering.,FEED and Detail Engineering with respect to Electrical Engineering.(Explain with Example)
how to check the continuity of a cable with a megger
Single phase and threephase power calculation