15. List 3 of your weakest points as a worker?
Answers were Sorted based on User's Feedback
Answer / subhasbabu
1.WORKER FIRST OBSERVE THE NATURE OF HIS IMMEDIATE BOSS
2.HE LIMITS THE LEVEL OF PERFORMANCE
3.GENERALLY WANTS TO ESCAPE FROM HIS DUTIES, WHEN HE WAS
ALLOTED ADDITIONAL WORKS.
4.ALWAYS COMPARE WITH HIS SALARY AMONG HIS COWORKERS
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / haleedai
'I am sometimes too much concerned with details..
| Is This Answer Correct ? | 2 Yes | 4 No |
1.(a.) how do you calculate the volume of mortar for 1 piece of block 450mm x 225mm x 225mm. (b.) calculate for 1sqm
What is the Oneday Productivity for 1 Skilled Carpenter and 1 Steel fixer?
how to consider the lap length of a bar in IS code and specify the code book name and clause& page number?
cement constant for brick works
How many cum of 9.5mm stone in 1 ton ?
if water absorption is more than 25 percent in brick, what is the defect in it?
one MT of steel for using how much binding wire required?
what is the specific gravity of rubble in plum concert
what is diffreant between the english bond&flamish bond
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
How to convert rainforcement calculation: Running meter to kg
23 Answers Interscape, Pratibha Industries,
cinder filling or Brick Aggregate filling in sunken portion.which one is better
1 Answers Chenab Valley Power Projects,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)