What tor stands for in tor steel?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Define What does civil status mean?
if cement is 70 kg. sand is 140 kg and coarse aggregate is 280 kg. so what is volume of cement, sand and coarse aggregate? please explane it.
Why the finite element method is lower bound solution?
Plan and schedule for 14 towers of 6 floors each with 6 flats on each floor?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?
31 Answers ABES Engineering College, Gammon, Jalanidhi, NCC,
How much lap length provided in compression and tension in bridges?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
WHAT IS PMB IN CASE OF ROAD PAVEMENT? WHY PMB IS PREFERED THAN ORDINARY BITUMINIOUS SURFACING?
Definition of plinth beam & Uses.