wat is d first thing to be seen 2 lay a cable in a
particular area??
Answer / sridhar
1. to identify the source & the destination
2. to identify the classification of Zones.
3. identify the shortest / nearest route to avoid max.
length of the cable & to avoid road crossing
4. to select the cable size wrt load & route length
5. to select the cable size wrt load, calculate the
starting & running voltage drop.
| Is This Answer Correct ? | 3 Yes | 0 No |
draw a circuit diagram connecting transformer OLTC- RTCC- VCB-Marshalling Box otherwise Explain in words
what is cathodic protection and why it use in industries?
working method of railway electricl loco in single wire 25000 volt
i want design of D.C.MOTOR 1HP 960RPM AND 2HP 960RPM ITS URRGENT
why the transformer ratings in kva or mva?
what is sevice settings for mccb?How can be it setted?
what is surge impedance loading?
How many types of electric motors are there?
what is the difference between synchronous motor and induction motor?
Why is water motor not taking the pressure? what is the problem?
Whats the type of current and potential transformers?
what is power factor when in view of a lineman
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)