what is the maximum Load capasity in LV-Panel,MDB,SMDB &
Final DB'S in Electrical disribution system?

Answers were Sorted based on User's Feedback



what is the maximum Load capasity in LV-Panel,MDB,SMDB & Final DB'S in Electrical disribu..

Answer / rsundareee

The MDB Maximum load depends on the Transformer,it is not
constant for the max load,if you want make load calculation
first you consider load downstream to upstream,please
following the steps...

*Calculate the Area(sqf or sqm)
*Calculate the load(lighting =1.5w/sqf,power=1w/sqf etc....)
*calculate the floor wise and get total load
*Applying the d.f and L.f and find the trf rating
*now you can design the MDB ,SMDB and FDB

Is This Answer Correct ?    34 Yes 12 No

what is the maximum Load capasity in LV-Panel,MDB,SMDB & Final DB'S in Electrical disribu..

Answer / santosh kumar

19

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is p.s impedance measurement test in earthing transformer?

0 Answers   Greenko,


What are stable systems?

0 Answers  


Dear All kindly let me know that I know about the DG Rating for Example 150 KVA,Now how i will know that how much Ampher load it can offoard.

2 Answers  


how can we measure the import power and export power in the same line?

1 Answers  


What are the uses of stepper motor?

0 Answers  






Here iam a question with SYNCHRONIZATION PANNEL related issue, as i want to design a SYNC.pannel board iam giving the 2 nos of 1MVA Generators to sync pannel , then what wil be the out put of the sync pannel, whether it wil be one cable coems from the sync panel or two cables.. as iam using two transformers to meet my load demand, so pls clear me whether two cables comes from sync panel to connect to transformers or only one cable

3 Answers  


What is the difference between diode and a transistor in terms of the direction of current flow?

0 Answers  


Transformer Parallel Operations

1 Answers  


Advantage of earthing transformer

2 Answers   EID Parry,


How to Calculate Current Rating of SDFU (Switch Disconnector Fuse unit) for Protectionof Capacitor Bank connected to Busbar of 800Amp,in LV side of 11/0.433KV, 250KVA Transformer?

0 Answers  


FOR ELECTRICAL TRANSMISSION TOWER WHAT SHOULD BE THE MINIMUM HEIGHT FROM THE GROUND? AND WHAT SHOULD BE THE DISTANCE BETWEEN THE TWO CONDUCTOR?

1 Answers  


what happens to a turbo alternator if it get trip and 1 out of 3 poles of circuit breaker in close condition

1 Answers   wbsedcl,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)