A 7 storey building has a floor area of 35,000sq.ft on each
storey. On the ground floor 11KV electrical sub-station is
to be erected. A load of 3kw for every 400sq.ft (p.f is
0.8) is proposed for each floor. fire pump 7.5hp, water
pump 5hp, lift 2 nos, each 10hp and 20shop load of each
shop is 5kw. calculate
a. load each floor
b. total load of building
c. L.T feeders for aech floor and from transformer to
main.
d. distribution diagram
e. capacity of sub-station/capacitor bank
f. line diagram
No Answer is Posted For this Question
Be the First to Post Answer
cause of failure of transformer bushes
i have three phase 25kva transformer but there is two phase line how can i connect to the two phase line?
what a function diesel generetaor turbo charger & turbo charger is more heated explain reason ?
what is neutral plane shift?
How can we calculate earth mat conductor size ..? & give the formula to determine earth conductor size?
Brief working principle of stabilizer,application & safety precautions
why transformer are rated in kva.
How does the phase sequence controller works, how it identifies the phases? confirm working principle
How much inductance or resistance require as a starter in series with induction motor of specific capacity(e.g. 5 hp) ? What is formula for it ?
What are the precautions to be taken before working on a cable?
In TNC switch, is there any 1NO+1NC block ? and if we move over closing position, is ther any affect on trip position or vice versa?
What is s-domain and its significance?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)