In industries Power factor is maintained by installing a
suitable KVAR bank, How is the PF maintained for domestic
use, where is the capacitor bank connected

Answers were Sorted based on User's Feedback



In industries Power factor is maintained by installing a suitable KVAR bank, How is the PF maintai..

Answer / bijay

For domestic supply ( 1 Phase) the PF variation is
comparatively low.
It is maintained at 0.95 by the Supply authority
(electricity board).
Capacitor Bank is located at the main
receiving/Distribution Station.

Is This Answer Correct ?    18 Yes 1 No

In industries Power factor is maintained by installing a suitable KVAR bank, How is the PF maintai..

Answer / raj

MAIN THING THE PF IS MAINTAIN FOR INDUCTIVE LOADS . IN
DOMESTIC WE HAVING THE RESISTIVE LOADS . BUT IN WE USING
FAN MOTORS AND SINGLE PHASE MOTORS ETC WE KNOW IN EVERY
SINGLE PHASE MOTOR WE CONNECT THE CAPACITOR IN SERIES OR
PARELLEL.SO PF IS MAINTAINING.

Is This Answer Correct ?    8 Yes 4 No

In industries Power factor is maintained by installing a suitable KVAR bank, How is the PF maintai..

Answer / rahul

we provided capacitor banks in the substations and
monitoring the variations in the load for all areas were
the loads distributed its done by with the help of aload
dispathing center

Is This Answer Correct ?    2 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

Give atleast 20 alternating current apparatus and devices.

0 Answers  


If age of Raju is 20% less than Sanju,then age of Sanju is how many % more than Raju

2 Answers   Tech Mahindra,


What is In (current rating) shown on the MCCB? Is this full load which can withstand by the circuit breaker

4 Answers  


what is the prosses for getting of 33kv licence (i have completed my engineering degree & working in 33kv substation for contract basis )????

0 Answers   Surana,


difference between ground,neutral and earth?..

4 Answers  






what do you mean by lagging and leading current.explain in detail.

1 Answers  


What is SFU ?

4 Answers  


how to calculate diesel consumption of diesel generator by considering load and capacity of generator?

1 Answers  


How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test?

2 Answers  


What is meant by electrical speed?

1 Answers  


Please clarify 1. Icw: rated short circuit working withstand capacity 2. Icu: Rated ultimate breaking capacity 3. Ics: Rated service short circut withstand capacity 4. other specification of ACB

0 Answers  


Why in a three pin plug the earth pin is thicker and longer than the other pins?

18 Answers   LG, NTPC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)